2017 we joined Kellerkind-Crew to improve the main stage of their "Schall im Schilf-Open Air", which takes place once a year in Garching near Munich.

The challenge of this project was to design and built a big, movable construction for approximately 9000 people in a short amount of time. Therefore as in other designs, it is the premise to use existing structures of former years constructions. By establishing towers and stalks equipped with a lot of technics, connected with curved steelpipes, it was possible to delimit the big area to a working dancefloor and generate a great vibe.

Client: Kellerkind Location: Garching, Germany
Project Year: 2017-2018
Area: 4000m²
People: 10000
Materials: Steel, Plexiglas, Dichroic DF-PA, Pine
Photographs: Kellerkind